Canvas print Critical Path Method CPM is shown using the text
Canvas print without frame:
- Surface: Satin
- Texture: Structured
- Canvas: Synthetic
- Hand-finishing: Canvas stretched on pine frame
- Weight: 260 g/m²
- Frame thickness: ±2 cm
- Included accessories: Dedicated mounting kit
- Dimensions of the picture hanger: Width: 4.5 cm; Length: approx. 1 cm; Height: 1 cm
- Notes: Edges with mirror effect; single-piece product
- Mounting system: Product ready for self-assembly
Canvas print with frame:
- Frame width from the front: 2 cm
- Frame width in profile: 3 cm
- Included accessories: Dedicated mounting kit
- Notes: Frame covers 2.5 mm of the image on each side
- Reference
- CA-000001