Canvas print Hand drawn WBS - Work Breakdown Structure • Canvas prints • Wallissimo®
    Canvas print Hand drawn WBS - Work Breakdown Structure • Canvas prints • Wallissimo®
    Canvas print Hand drawn WBS - Work Breakdown Structure • Canvas prints • Wallissimo®
    Back of canvas – sample material
    Sample material structure

    Canvas print Hand drawn WBS - Work Breakdown Structure

    Hand drawn WBS - Work Breakdown Structure, acronym business concept on blackboardMoreLess
    from $71.89

    Style: No frame

    Choose size & customize
    Dimensions
    cm
    cm
    Need help with a purchase? Write to us:
    • FAQ
    • info@wallissimo.com
    Safe payments
    Ready for shipping within 3 business days

    Canvas print without frame:

    • Surface: Satin
    • Texture: Structured
    • Canvas: Synthetic
    • Hand-finishing: Canvas stretched on pine frame
    • Weight: 260 g/m²
    • Frame thickness: ±2 cm
    • Included accessories: Dedicated mounting kit
    • Dimensions of the picture hanger: Width: 4.5 cm; Length: approx. 1 cm; Height: 1 cm
    • Notes: Edges with mirror effect; single-piece product
    • Mounting system: Product ready for self-assembly

    Canvas print with frame:

    • Frame width from the front: 2 cm
    • Frame width in profile: 3 cm
    • Included accessories: Dedicated mounting kit
    • Notes: Frame covers 2.5 mm of the image on each side
    964 Items
    Reference
    CA-000001

    End of the list? This is just the beginning!

    Use the search engine to find the perfect design among millions of images. What will you type first?

    Loading...