Wall mural Time Is Up Indicates Behind Schedule And Checking
Custom-made photo wallpaper
Transform your interiors with our made-to-measure photo wallpapers that combine style, quality and functionality! Whether you want to enliven the living room, add character to the kitchen, or create a cozy atmosphere in a child's room, our wallpapers are the perfect choice. We offer four unique substrates – non-woven, vinyl, washable (laminated) and self-adhesive – each designed to meet your needs and give the space a distinctive look. Printed using eco-friendly HP Latex® technology with odorless water-based inks, our wallpapers are safe for children and allergy sufferers, and their durability and aesthetics will impress for years.
Which substrate to choose for your wallpaper?
- Non-woven: A breathable material that conceals minor wall imperfections, with a satin finish and easy edge-to-edge installation. Ideal for living rooms and bedrooms, providing elegance and a subtle look.
- Vinyl: Durable and moisture-resistant, designed for demanding spaces such as kitchens or bathrooms. The glossy finish enhances vivid colors, and the material is resistant to mechanical damage.
- Washable (laminated): Perfect for high-traffic areas like hallways or public spaces. The laminate protects against scratches and stains, allowing intensive cleaning without loss of quality.
- Self-adhesive: A revolution in ease of application – no glue, no mess! Ideal for quick makeovers, easy to remove without residue, with a matte finish for a subtle effect.
Your vision, our quality
Each wallpaper is custom-made with invisible seams, ensuring a perfect look on any wall. UV resistance keeps colors vibrant even in sunlit rooms. The kit includes adhesive (for non-self-adhesive substrates) and installation instructions, so you can transform your interior in moments. Choose a design from tens of thousands of options or upload your own artwork to create a space that reflects your style.
| Finish | Satin |
| Texture | Smooth |
| Weight | 130–150 g/m² |
| Maximum width of a single sheet | Approximately 100 cm; if this width is exceeded, the graphic is divided into several equal sheets or according to guidelines |
| Notes | Wallpaper cut to the selected size, ready to apply |
| Mounting method | Edge to edge (no overlap); adhesive is applied directly to the wall |
| Accessories included | Adhesive, installation instructions |
- Reference
- FT-000001-MVE